I went back through old pictures trying to figure out when the entire backyard makeover project began. It was June of 2008. Seriously, we've been working on this project for over 2 years!?!
It all started because the pool had a leak in the liner. We decided that we didn't use it often enough to spend the money to replace/fix it. Plus we had 2 very small children and felt it was safer not to have a pool. This summer (2010) had record-breaking heat, I missed the pool! I am sure the kids would have loved it too. Doh!
After the pool was taken out, Clay ripped down the part of the deck that contoured around the pool. We also had to shovel out all of the mulch that was around the pool.
By Fall we were ready for a load of dirt to level out the ground.
November 2008 we have grass seed planted.
Spring 2009. Time to start ripping out the old deck boards - they were in bad condition.
Then Elliott came along and Ironman training began, so the backyard sat..... and sat......and sat some more. This Spring we will put a stain on the deck and do some minor low maintenance landscaping. Three years after we had this genius idea of taking out the pool, we will be able to use our backyard! Moral of the story, if you don't want to use your pool, leave a tarp on it and use your front yard (or hire someone else to do the work)!
I think I am not going to be able to get Clay to do another project for awhile after this.
